Westminster Mall

Originally build in the 1970’s, the former Westminster Mall was due to be demolished in preparation for the creation of a new mall at the Sheridan Boulevard-US 36 intersection. Due to risks of hazardous materials being present, Peter Smith’s former company SMITH provided a wide range of industrial hygiene and hazardous material assessment services during this multi-year long project, including surveys and abatement inspections on the main mall structure and several outbuildings.

SMITH conducted multiple survey at the main mall and adjacent structures to identify possible asbestos-containing material and lead-based paint that would require abatement prior to the demolition; and proceeded to overseeing the abatement and providing air monitoring services during the process. On this project, SMITH was tasked with:

  • Completing a Phase I ESA

  • Asbestos and lead-based paint investigation

  • Review of the project design

  • Remediation plan preparation

  • Abatement oversight and inspection

  • Air monitoring during abatement

Interested in working with Black Forest Environmental, LLC? Contact us today to book your consultation!